Case Studies
AllGoodThings2000

Hobbs & All Good Things, Dudley

In 2019, Abr were appointed, based on their knowledge and historic experience of the centre, to carry out the full interior fit-out of units 61-63 to provide a turn-key..

Read More
StarCityVirginGym2000

Former Virgin Gym, Start City, Birmingham

Following on from the successful completion of the Pod Unit at Star City, Abr was selected to carry out the extensive internal strip-out...

Read More
IntuHO2000

The Nest, Intu Head Office, Central London

Having successfully worked for intu on numerous centres over the past three years, Abr was selected to carry out the internal fit-out...

Read More
StarCityRetail2000

Retail Pod, Star City, Birmingham

ABR awarded to construct new 3,000 sq.ft oval shaped retail unit under a full design and build contract at the entrance to the existing retail park...

Read More
116117Bicester1500

Unit 116-117, Bicester Village

In January 2015, Abr Projects Ltd successfully carried out our first project for Value Retail at Bicester Village. Works consisted of completely...

Read More
BicesterToilets1500

Toilet Block B, Bicester Village

Bicester Village is one of the UK’s premier retail outlets. When people visit, they want to find the whole shopping experience on offer there...

Read More
AltroDesignCentre1500

Altro Design Centre, London

Following on from the successful completion of the main reception at Altro Head Office, Letchworth, Abr Projects Ltd went onto carry out the full...

Read More
ASSOS-Pano-Bike1500

ASSOS of Switzerland - UK Flagship Store

In 2016, Abr Projects Ltd was awarded the internal fit-out of the UK flagship store for ASSOS Cycling Equipment on Regent Street, London.The project...

Read More
BicesterVillageManSuite1500

Bicester Village - Management Suite 1

In 2015, Abr Projects Ltd carried out the construction of a new build 3,600 sqft extension onto the existing Value Retail Management Suite office...

Read More
MicroPods1500

Micro Pods Concept Living Apartments, London

Following a long-standing relationship with Ab Rogers Design, as their preferred contractor – Abr Projects Ltd was awarded the Micro-living...

Read More
AltroHeadOffice1500

Altro Head Office, Letchworth

In 2015, Abr Projects Ltd carried out its first project for Altro Flooring Ltd, following a recommendation and long-standing working relationship...

Read More
8283Bicester1500

Bicester Village, Oxford – Units 82 & 83

Whilst working on-site at Bicester Village, Abr Projects Ltd were instructed to carry out the complete strip-out of Units 82-83, along with...

Read More
7071Bicester1500

Bicester Village, Oxford – 70 & 71

In 2016, Abr Projects Ltd were employed based on their knowledge and historic experience of the centre to carry out the strip-out and reconfiguration...

Read More
Olivo-interior-tables-&-wall1500

Olivo, London

In 2016, Abr Projects Ltd carried out its first project for the Olivo Restaurant chain in Victoria, London. The works included the full refurbishment...

Read More

If you can envision it, then we can build it. Tell us more about your project or project ideas